Skip to content
A portfolio gallery, not a wall of text
Website and structure

What a Website Really Costs: Fixed Price or Plan

Fixed price, hourly rate or builder subscription: what belongs in the price, which costs keep running, what own work saves and how five years actually add up.

14 min read KostenFestpreisStundensatzFolgekostenBudget

Three quotes are on the desk and none of them can be compared with the others. The first names a fixed price for the complete website. The second names an hourly rate and an estimate that is expressly not a commitment. The third names a low monthly payment that supposedly includes everything, and no build cost at all. For anyone running a landscaping business this is the same situation their own customers face when they collect three quotes for the same terrace: the smallest figure wins until someone asks what lies beneath the paving. This article works the three models through over five years, names the items that appear in none of the quotes and puts a figure on what doing the work yourself actually saves. It does not replace a review of your specific quote, but it does say which questions to ask before signing. Anyone who wants to sort the orders of magnitude first will find them on the pricing page.

What a website costs over five years: three modelsFixed priceHourly rateBuilder planBuildOne-off, known upfrontScope named in the contractOpen, billed by effortEstimate, not a commitmentLow or no upfront amountBuild sits inside the ratePer yearHosting, care, domainPredictable fixed amountEvery change billed by timeSmall items add upMonthly rate keeps runningRate grows with add-onsAfter 5 yearsOne-off cost plus careTotal known in advanceTotal clear only in hindsightInvisible without invoicesSixty payments madeOften the smaller figureOwnershipFiles and content in houseMove possible at any timeUsually in house, per contractSettle in writing before you signBuild stays in the systemCancelling means rebuildingThe price is not decided in year one, it is decided in year fiveNot in the quote, payable anyway: domain, image work, legal texts, upkeep, your own working time

Key takeaways

  • Fixed price, hourly rate and builder subscription cannot be compared by their opening figure: only the sum of build, upkeep, changes and your own working time over five years shows which model is genuinely cheaper for the business.
  • A dependable fixed price names the number of pages, the origin of the text, the handling of images, the legal texts and the point of acceptance; if one of these is missing, it later reappears on the invoice as a variation.
  • Four items keep running after the build and rarely appear in the quote: domain, hosting, technical upkeep and the preparation of new site photographs. Missing them means the website was miscalculated, not overpriced.
  • Doing the work yourself lowers the build price noticeably and costs deadlines: supplying text and photographs in house often pushes the start back by weeks, because the input gets stuck between site and office during the season.
  • A builder subscription can be the smaller figure over five years and still leave the business with nothing in hand: on cancellation you take the text and photographs with you, but not the structure of the site.

Three pricing models, three different risks

The three quotes cannot be compared because they describe different things. A fixed price describes a result: a finished website with a scope agreed in advance. An hourly rate describes effort: the working time someone spends on your project, without the total being fixed. A subscription describes use: the right to fill someone else's system with content for as long as the payments continue. Placing those three figures side by side compares a piece of work with a timesheet and a rental.

At heart the difference is a question every landscaping firm knows from its own trade: who carries the risk if the job turns out bigger than expected? With a fixed price the supplier carries it. They build in a buffer, and that buffer is the price of knowing in advance what the final invoice will say. With an hourly rate you carry the risk. If everything runs smoothly you pay less than the fixed price. If the coordination drags on you pay more, and you notice only when the invoices arrive.

With a subscription nobody carries the risk at first, which is exactly what makes it attractive at first glance. There is no large amount falling due at once, and leaving appears possible at any time. You still pay, just in sixty small amounts instead of one large one. The real difference does not show up in the cost but at the end of the term: with a fixed price or an hourly rate you have something afterwards, with a subscription you had something for five years.

QuestionFixed priceHourly rateBuilder plan
What is being soldA resultWorking timeUse of a system
Who carries the effort riskThe supplierThe businessOpen until cancelled
When is the total knownBefore the startAfter the projectOnly after the term
How changes are paid forAs a named variationBy timeThrough add-on packages
What remains after five yearsThe website in houseThe website in houseText and images
Suited toA clear scopeOngoing workA very short horizon

What a fixed price should contain

A fixed price is only as dependable as the description behind it. You know this from your own quotes: a terrace at a lump sum without stating area, surface, sub-base and disposal is not a calculation but an invitation to argue. The same applies to a website. The price says nothing until the document states how many pages will be built, who writes the text, what happens to the photographs and when acceptance takes place.

How many service pages a business needs depends on its trades. A firm offering paving, terraces, cisterns and complete garden installations, as is the case with Viktor Waldbauer Garten- und Landschaftsbau in Nordstemmen, ends up with more pages than one that only does commercial grounds maintenance. That is why page count is the first point that belongs in a fixed-price quote. Everything else follows from it: volume of text, image requirement, coordination effort.

Page scope

Home page, a service page per trade, references, service area, contact, legal texts. The number belongs in the quote, not in a verbal agreement.

Text

Who writes it: the supplier after an interview, you, or a mix? This point shifts the price more than any technical decision.

Images

Cropping, brightness, file size and order of your site photographs. Without this item, unedited shots end up in the gallery.

Mobile view

Most enquiries arise on a phone in the evening. The mobile view is not an extra but the main case and belongs in the base price.

Legal texts

Legal notice, privacy policy and consent in the form. Whether they are included or bought in externally belongs in the quote.

Acceptance

A named date, a correction round with a defined scope, a sign-off. Without an acceptance rule it stays unclear when the project ends.

If one of these six points is missing from the quote it does not disappear, it resurfaces later as a variation. That is not dishonest, it is the logical consequence of an incomplete description. You know the mechanism from the other side: whatever is missing from the schedule of works is either ordered afterwards or argued about afterwards. Anyone wanting an overview of the building blocks that make up a site for a landscaping firm will find it under landscaping website.

Where an hourly rate makes sense and where it derails

An hourly rate has a legitimate place, but not for the initial build. It works where the scope is open by nature: ongoing work, small additions across the year, an analysis where the first look raises a second question. Demanding a fixed price for that would mean writing a quote for every half hour, and that costs both sides more than the work is worth.

For the initial build, time billing derails at one particular point: coordination effort. When three people in the business have different ideas about the home page, when text is rearranged over several rounds, when photographs are supplied and then swapped again, hours accumulate that nobody planned. With a fixed price that effort is priced in. With an hourly rate you pay for it, and you pay for decisions being made inside your own company.

So if you engage on a time basis you need two things stated in the quote: a ceiling above which work pauses for a conversation, and an invoice that names activities rather than merely totalling hours. A timesheet with the line web work is as informative as a construction stage payment with the line garden work. Neither can be checked.

Put the ceiling in writing

With time billing, agree an amount at which the supplier pauses and comes back to you before continuing. This is not a statement of mistrust but a rule that protects both sides: you from an invoice you had not expected, and the supplier from the argument about whether the hours were reasonable. Also record the intervals at which work will be billed, so that costs stay visible during the project rather than only at the end.

The builder subscription: low rate, open bill

In the subscription model the website is built inside a website builder operated by a supplier. The build is priced low or waived entirely, and a monthly payment runs instead. Over five years this is often the smaller figure in pure cash terms, and it would be dishonest to hide that. Anyone who needs to be visible quickly and has no reserve for a one-off investment is not making a wrong decision here, as long as they know what they are buying.

What they are buying is use, not ownership. The text belongs to the business, the photographs belong to the business, and the domain can usually be taken along. The structure of the site does not. Anyone switching after four years starts the build again from scratch, and the work on structure, sequence and form logic falls due a second time. That is the item the monthly payment does not show and that even a five-year calculation only reveals at its edge.

The second point concerns the rate itself. It is rarely stable across the whole term, because functions not needed at the start arrive later as add-on packages: more pages, larger image storage, a form with a file attachment for customer photographs. Each package is small on its own. Together they move the calculation noticeably, and they do so in the year when the business is growing and the website is supposed to do more.

The question to settle before you sign

Before signing, ask what comes with you when you move to another supplier. Text and images in a common format, yes or no? Domain registered to the business, yes or no? Access to the content without an active subscription, yes or no? Three answers that cost two minutes and decide the cost of the step after next. If one of the answers is vague, the price is not the price.

Running costs that rarely appear in the quote

One-off costs are the part people talk about. Running costs are the part that surprises, usually in the second year, when the first invoice arrives for something the build price did not include. Four items continue after the build regardless of the chosen model. Individually they are small; over five years they add up to more than some build prices.

A fifth item generates no invoice and costs money anyway: your own working time. Someone in the business has to select photographs, report changes, supply new references and update the job ad. Those hours occur whether or not they are recorded, and they occur in spring, when they are at their most expensive.

  • Domain each year, usually a small amount, but registered to the business rather than to the supplier
  • Hosting each month, with security updates, backups and a contact who can be reached when something breaks
  • Technical upkeep, so that forms, maps and image galleries keep working after system updates
  • Content upkeep, meaning new references, current prices, changed opening hours and job ads
  • Preparation of new site photographs, unless the gallery is meant to age within a single season
  • Your own working time for input, sign-offs and coordination, scheduled rather than squeezed in

Bundling these items into a flat rate makes them plannable: upkeep and hosting can be budgeted from 39 euro per month (project experience), and preparing a set of photographs starts at 290 euro (project experience). What matters is less the amount than whether the item appears in the budget at all. A website without budgeted maintenance does not age slowly but in jumps: it works, works, works, and then one day the form stops accepting enquiries.

Doing it yourself: what it saves and what it costs

Self-performed work is a familiar topic in landscaping, usually from the other side: the customer wants to do the excavation to save money, and the firm knows the saving often turns out smaller than expected, because the schedule slips and the preliminary work has to be reworked. A website is no different. Doing it yourself lowers the build price, but it moves work rather than removing it.

The biggest saving comes from supplying photographs that are already usable. Shots taken in daylight, in landscape format, from the same viewpoint before and after the work: images like that save the project a whole round. How to take them with a phone is described on the page photographs for your website. The smallest saving comes from insisting on writing the text yourself without booking fixed time for it. Text that sits untouched for three months costs more than any text item in the quote.

So price your own work with an internal hourly rate. If an hour of office time in the business is costed at 45 euro (project experience), thirty hours of self-performed work cost 1,350 euro that appear on no invoice and are missing from the business all the same. That makes the comparison honest and the decision easier: some tasks are worth taking on, others are not.

TaskTake it on yourselfHand it over
Taking site photographsWorth it, you are already thereOnly needed in special cases
Cropping and lightening photosTime-consuming without practiceA clear, one-off item
Describing your servicesIrreplaceable as expert inputWording and structure
Writing the finished textGets stuck during the seasonKeeps the schedule
Adding new referencesManageable once set upSensible for large batches
Keeping the system currentNot advisableBelongs in the care package

Self-performed work without a fixed date in the calendar is not a saving but a delay with an invoice attached.

A principle from project planning

The five-year calculation

Five years is a realistic horizon for a website (project experience). Rebuilding earlier is rare, and much later the structure becomes a burden both technically and in content terms. Within that period the three models can be compared, because every item occurs at least once: build, images, running costs, changes and your own working time.

The worked example below assumes a business covering four trades, with a reference gallery and an enquiry form, at the same page count in all three models. The amounts come from our own projects (project experience) and are net. They are not a quote but an order of magnitude against which you can place your own figures.

five-year-calculation.txt
# Worked example (project experience), all amounts net, in euro
# Assumption: same page count, five years of use, a firm covering four trades

Item                         Fixed price  Hourly rate   Builder plan
--------------------------------------------------------------------
Build, one-off                     2,900        2,975              0
Image preparation                    290            0              0
Hosting and care, 5 years          2,340          720          3,540
Changes over 5 years                 600        2,550            960
--------------------------------------------------------------------
Total after 5 years                6,130        6,245          4,500

Own working time                   8 hrs       10 hrs         30 hrs
valued at 45 euro/hour               360          450          1,350
--------------------------------------------------------------------
Total burden, 5 years              6,490        6,695          5,850

Owned afterwards                     yes          yes             no

Two things stand out. First, fixed price and hourly rate sit closer together than the quotes suggest: the hourly rate is cheaper to build and recovers the difference over five years through changes, because every small item is billed separately. Second, the subscription is the smaller figure as long as you only count invoices, and the larger one as soon as your own working time is given a value.

The line without a figure turns out to be the most important: what does the business own after five years? With a fixed price or an hourly rate, a website that can be moved, extended and reused. With a subscription, a stock of text and images and the task of paying for the build a second time. Anyone wanting a fair comparison adds that second build to the subscription total and runs the numbers again.

How to spot a dependable quote

A quote can be checked in a few minutes once you know what to look for. The check follows the same logic you apply to your own quotes: what is described, what is excluded, what happens when things deviate, and when is the work complete?

The five steps below are enough for a first assessment. They do not replace a contractual review, but they show whether a supplier has thought beyond the build or has merely named an amount.

If a supplier gives a clear answer on all five points, the price they name is dependable, even where it sits above the comparison figure. If three points stay open, the smaller number in the quote is not a saving but a deferral into the future.

When the budget will not stretch to everything at once

Not every business can tie up several thousand euro over winter, especially with a machine purchase due in spring. The answer is rarely the cheapest quote but a smaller first stage. A website from 1,490 euro (project experience) with few but complete pages achieves more than an extensive site whose content stays half finished because the input never arrives.

The sensible order follows effect: first the pages that generate enquiries, meaning the home page, the two or three most important trades, the service area and an enquiry form that asks the questions otherwise settled on the phone. Further trade pages, the full reference gallery and the careers page follow later. A more extensive build from 2,900 euro (project experience) pays off once photographs and text genuinely exist.

What rarely pays off is refreshing an existing site only superficially because a rebuild seems too expensive. If structure, loading behaviour and mobile presentation do not hold up, the refresh is spending without effect that falls due again two years later. Whether a relaunch is worthwhile or upkeep is enough is decided on those three points, not on the age of the site.

Check tax and funding for your own case

Website costs are business expenses, but their tax treatment depends on the amount, the contractual arrangement and the split between a one-off build and an ongoing service. Talk this through with your tax adviser before placing an order. Whether digitalisation programmes in your federal state offer grants, and whether a trade business qualifies, changes regularly and can only be answered as at a given date. These notes do not replace advice on your specific case.

What a later switch costs

The final item in the cost calculation only arises long after the project is finished: the switch. Businesses change supplier for good reasons, because someone retires, because support fades or because the business has grown. How expensive that switch becomes is decided not at the switch but when the order is placed years earlier.

Three points determine the amount. First the domain: if it is registered to the business, the move is a formality, otherwise it becomes a negotiation. Second the content: if text and images exist in a common format they can be taken along, otherwise they are retyped and reworked. Third the structure: an independently operated system moves, a builder account does not.

At the point of ordering, those three points cost nothing beyond asking about them. Settling them at the switch usually costs several working days. That is why the exit question belongs in the same conversation as the price, even though the two appear to sit far apart.

This article is based on data from our own project experience — building, maintaining and supporting websites for trade and landscaping businesses. The amounts named are orders of magnitude from completed projects rather than quotes; they can differ depending on scope, available photographs and region. Tax questions, eligibility for funding and contract wording should be settled case by case with a tax adviser or a lawyer.

Related Articles